{"id":221,"date":"2019-11-30T12:18:55","date_gmt":"2019-11-30T09:18:55","guid":{"rendered":"https:\/\/insenerehitus.ee\/projektid\/uue-lainemurdja-ja-lainekaitseseina-ehitamine-noblessneri-sadamas\/"},"modified":"2026-11-04T10:52:02","modified_gmt":"2026-11-04T10:52:02","slug":"construction-of-a-new-breakwater-and-wave-barrier-in-the-noblessner-harbor","status":"publish","type":"projektid","link":"https:\/\/insenerehitus.ee\/en\/projektid\/uue-lainemurdja-ja-lainekaitseseina-ehitamine-noblessneri-sadamas\/","title":{"rendered":"Construction of a new breakwater and wave barrier in the Noblessner Harbor"},"content":{"rendered":"<p class=\"translation-block\"><strong>Period:<\/strong> 07.12.2018 \u2013 30.11.2019<br>\n<strong>Customer:<\/strong> BLRT Grupp AS<br>\n<strong>Location:<\/strong> Noblessner Harbor, Tallinn<\/p>","protected":false},"template":"","aasta":[6],"too_liik":[21],"class_list":["post-221","projektid","type-projektid","status-publish","hentry","aasta-6","too_liik-sadamaehitus"],"acf":[],"_links":{"self":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid\/221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid"}],"about":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/types\/projektid"}],"wp:attachment":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/media?parent=221"}],"wp:term":[{"taxonomy":"aasta","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/aasta?post=221"},{"taxonomy":"too_liik","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/too_liik?post=221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}