{"id":268,"date":"2014-12-19T13:40:16","date_gmt":"2014-12-19T10:40:16","guid":{"rendered":"https:\/\/insenerehitus.ee\/projektid\/rohukula-sadama-kai-nr-1-akvatooriumi-ja-rukki-kanali-suvendamine-i\/"},"modified":"2026-11-04T10:52:02","modified_gmt":"2026-11-04T10:52:02","slug":"dredging-the-water-area-of-quay-1-in-rohukula-harbour-and-rukki-channel-i","status":"publish","type":"projektid","link":"https:\/\/insenerehitus.ee\/en\/projektid\/rohukula-sadama-kai-nr-1-akvatooriumi-ja-rukki-kanali-suvendamine-i\/","title":{"rendered":"Dredging the water area of Quay 1 in Rohuk\u00fcla Harbour and Rukki channel I"},"content":{"rendered":"<p class=\"translation-block\"><strong>Period:<\/strong> 14.07.2014 \u2013 19.12.2014<br>\n<strong>Customer:<\/strong> Saarte Liinid AS<br>\n<strong>Public Procurement Reference number:<\/strong> 152070<br>\n<strong>Description:<\/strong> Dredging work on Rukki channel and in the water area of Quay 1 in Rohuk\u00fcla Harbour.<\/p>","protected":false},"template":"","aasta":[11],"too_liik":[21],"class_list":["post-268","projektid","type-projektid","status-publish","hentry","aasta-11","too_liik-sadamaehitus"],"acf":[],"_links":{"self":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid\/268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid"}],"about":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/types\/projektid"}],"wp:attachment":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/media?parent=268"}],"wp:term":[{"taxonomy":"aasta","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/aasta?post=268"},{"taxonomy":"too_liik","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/too_liik?post=268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}