{"id":284,"date":"2013-08-05T14:24:51","date_gmt":"2013-08-05T11:24:51","guid":{"rendered":"https:\/\/insenerehitus.ee\/projektid\/vanasadama-kai-nr-1-kaldakindlustuse-rekonstrueerimine\/"},"modified":"2026-11-04T10:52:02","modified_gmt":"2026-11-04T10:52:02","slug":"reconstruction-of-bank-reinforcement-of-quay-1-in-the-old-city-harbour","status":"publish","type":"projektid","link":"https:\/\/insenerehitus.ee\/en\/projektid\/vanasadama-kai-nr-1-kaldakindlustuse-rekonstrueerimine\/","title":{"rendered":"Reconstruction of bank reinforcement of Quay 1 in the Old City Harbour"},"content":{"rendered":"<p class=\"translation-block\"><strong>Period:<\/strong> 27.05.2013 - 05.08.2013<br>\n<strong>Customer:<\/strong> Tallinna Sadam AS<br>\n<strong>Location:<\/strong> Old City Harbour, Tallinn<br>\n<strong>Description:<\/strong> Designing the slope under the bank reinforcement, manufacture and installation of 360 tetrapods, installation of a storm water discharge and a sampling well.<\/p>","protected":false},"template":"","aasta":[12],"too_liik":[21],"class_list":["post-284","projektid","type-projektid","status-publish","hentry","aasta-12","too_liik-sadamaehitus"],"acf":[],"_links":{"self":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid\/284","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid"}],"about":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/types\/projektid"}],"wp:attachment":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/media?parent=284"}],"wp:term":[{"taxonomy":"aasta","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/aasta?post=284"},{"taxonomy":"too_liik","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/too_liik?post=284"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}