{"id":302,"date":"2011-04-01T14:46:54","date_gmt":"2011-04-01T11:46:54","guid":{"rendered":"https:\/\/insenerehitus.ee\/projektid\/kuivastu-virtsu-rohukula-ja-heltermaa-sadamate-navigatsioonisusteemide-rekonstrueerimine\/"},"modified":"2026-11-04T10:52:02","modified_gmt":"2026-11-04T10:52:02","slug":"reconstruction-of-navigation-systems-in-the-harbours-of-kuivastu-virtsu-rohukula-and-heltermaa","status":"publish","type":"projektid","link":"https:\/\/insenerehitus.ee\/en\/projektid\/kuivastu-virtsu-rohukula-ja-heltermaa-sadamate-navigatsioonisusteemide-rekonstrueerimine\/","title":{"rendered":"Reconstruction of navigation systems in the harbours of Kuivastu, Virtsu, Rohuk\u00fcla, and Heltermaa"},"content":{"rendered":"<p class=\"translation-block\"><strong>Period:<\/strong> 10.2010 \u2013 4.2011<br>\n<strong>Customer:<\/strong> Saarte Liinid AS<br>\n<strong>Description:<\/strong> Sandblasting and painting of metal elements of navigation signs. Installation\/replacement of underground power supply cables of light beacons and navigation signs.<\/p>","protected":false},"template":"","aasta":[14],"too_liik":[21],"class_list":["post-302","projektid","type-projektid","status-publish","hentry","aasta-14","too_liik-sadamaehitus"],"acf":[],"_links":{"self":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid\/302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid"}],"about":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/types\/projektid"}],"wp:attachment":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/media?parent=302"}],"wp:term":[{"taxonomy":"aasta","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/aasta?post=302"},{"taxonomy":"too_liik","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/too_liik?post=302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}