{"id":305,"date":"2010-11-22T14:53:27","date_gmt":"2010-11-22T11:53:27","guid":{"rendered":"https:\/\/insenerehitus.ee\/projektid\/muuga-sadama-laanemuuli-kaldakindlustuse-osaline-rekonstrueerimine-i-etapp\/"},"modified":"2026-11-04T10:52:02","modified_gmt":"2026-11-04T10:52:02","slug":"partial-reconstruction-of-the-bank-reinforcement-of-the-western-pier-in-muuga-harbour-stage-1","status":"publish","type":"projektid","link":"https:\/\/insenerehitus.ee\/en\/projektid\/muuga-sadama-laanemuuli-kaldakindlustuse-osaline-rekonstrueerimine-i-etapp\/","title":{"rendered":"Partial reconstruction of the bank reinforcement of the Western Pier in Muuga Harbour, stage 1"},"content":{"rendered":"<p class=\"translation-block\"><strong>Period:<\/strong> 19.09.2010 \u2013 22.11.2010<br>\n<strong>Customer:<\/strong> Tallinna Sadam AS<br>\n<strong>Location:<\/strong> Muuga Harbour, Harju County<br>\n<strong>Description:<\/strong> Construction of granite stone slope reinforcement; manufacture and installation of 520 tetrapods.<\/p>","protected":false},"template":"","aasta":[15],"too_liik":[21],"class_list":["post-305","projektid","type-projektid","status-publish","hentry","aasta-15","too_liik-sadamaehitus"],"acf":[],"_links":{"self":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid\/305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/projektid"}],"about":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/types\/projektid"}],"wp:attachment":[{"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/media?parent=305"}],"wp:term":[{"taxonomy":"aasta","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/aasta?post=305"},{"taxonomy":"too_liik","embeddable":true,"href":"https:\/\/insenerehitus.ee\/en\/wp-json\/wp\/v2\/too_liik?post=305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}