Harbour construction
2008Bed reinforcement in front of Quays 5 and 6 in Muuga Harbour
Period: 7.2008 – 12.2008
Customer: Tallinna Sadam AS
Location: Harju County
Harbour construction
2008Period: 7.2008 – 12.2008
Customer: Tallinna Sadam AS
Location: Harju County
2008
3
Harbour construction
Period: 3.2008 – 09.2008
Customer: Saarte Liinid AS
Location: Manija Village, Pärnu County
Description: Demolition of the existing quay and construction of a new ferry quay. Pouring of a reinforced concrete edge beam. Installation of a new steel ramp and quay equipment. Pier construction. Electrical works.
2008
2
Harbour construction
Period: 1.2008 – 06.2008
Customer: Estonian Maritime Museum
Public Procurement Reference number: 102655
Location: Seaplane Harbour Tallinn
2008
Harbour construction
Period: 29.08.2007- 30.05.2008
Customer: Tallinna Sadam AS
Location: Paldiski, Harju County
Description: Reinforcement of seabed in front of the quays with reinforced concrete slabs on an area of 15,000m².
2007
2
Harbour construction
Period: 9.2007 – 10.2007
Customer: Tallinn Olympic Yachting Centre
Location: Tallinn
Description: Manufacture and installation of 186 tetrapods
Harbour construction
2007Period: 5.2007 – 8.2007
Customer: BMGS Estonian Branch AS
Location: Paldiski South Harbour, Harju County
Description: Steel shore ramp, 672m³ of reinforced concrete, water supply, sewerage
2007
2
Harbour construction
Period: 2.2007 – 4.2007Customer: Raunopol AS
Location: Tallinn
Description: Sinking of tube poles, sheeting elements and square sheeting poles on the sea.