Emergency repairs to the corner section of Berths 5 and 6 at the Vene-Balti Port, Kopli 103, Tallinn
Period: 30 May 2025 – 20 October 2025
Client: BLRT Grupp AS
Location: Kopli Peninsula, Tallinn, Estonia
Sheet Pile Wall Installation for the Reconstruction of the Protective Structures at Miinisadam Harbour
Period: 25 February 2025 – 30 June 2025
Client: Bauest OÜ
Location: Kopli Peninsula, Tallinn, Estonia
Construction of the Sewer Collector at Paljassaare Tee 6
Period: 25 March 2025 – 30 May 2025
Client: KE Infra AS
Location: Kopli Peninsula, Tallinn, Estonia
EstLink 2 Sheet Pile Wall Construction
Period: June 2024 – October 2024
Client: Enersense AS
Installation of an Additional Bollard and Access Walkway at Berth No. 15, Muuga Harbour
Period: 10 May 2024 – 18 July 2024
Client: Port of Tallinn Ltd. (AS Tallinna Sadam)
Location: Muuga Harbour, Harju County, Estonia
Maintenance dredging works in the canal Heltermaa
Period: 11.07.2024-06.09.2024
Customer: Aktsiaselts Saarte Liinid
Location: Heltermaa canal