Project details
- Project type
- Harbour construction
- Year
- 2012
- Photos
- 3
Period: 16.09.2011 – 15.06.2012
Customer: Tallinna Sadam AS
Location: Admiralty Basin in the Old City Harbour, Tallinn
Description: New steel sheeting anchored with injection anchors in front of the wooden poles of the existing quay. Reinforced concrete edge beam, concrete stone pavement, water supply, storm water drainage, power and communication installation. Total length of quays: 450m.