Project details
- Project type
- Harbour construction
- Year
- 2021
- Photos
- 2
Period: 10.03.2021 – 30.09.2021
Customer: AS BMGS Filial
Location: Manufacturing of concrete caissons in Tallinn, Lahesuu harbor, on the floating barge
Description: Production of concrete weights on the quay