Project details
- Project type
- Elimination of residual pollution
- Year
- 2014
- Photos
- 2
Period: 23.10.2013 – 25.02.2014
Customer: Viiratsi municipality
Location: Viljandi county
Description: Removal of 6 bitumen tanks and polluted soil.
Projects
Project details
Period: 23.10.2013 – 25.02.2014
Customer: Viiratsi municipality
Location: Viljandi county
Description: Removal of 6 bitumen tanks and polluted soil.
2015
2
Elimination of residual pollution
Period: 21.04.2011 – 30.10.2015
Customer: Environmental Information Centre
Public Procurement Reference number: 121515
Description: Design and general contracting. Biological treatment of polluted soil, removal and subsequent treatment of heavily polluted soil. Demolition of facilities on polluted areas and management of the resulting waste. Reconditioning of cleaned areas and restoring them to a good condition. Implementation of a monitoring system for investigation following the elimination of pollution.
Elimination of residual pollution
2015Period: 10.08.2015 – 30.10.2015
Customer: OÜ RTS Infraehitus
Location: Võru
Elimination of residual pollution
2012Period: 10.05.2011 – 17.10.2012
Customer: Environmental Information Centre
Public Procurement Reference number: 121706
Description: Design and general contracting. Localisation of sources of residual pollution, which pose a risk to groundwater; prevention of environmental pollution, and elimination of residual pollution on former military and industrial areas. Removal and treatment of contaminated soil; demolition of facilities in polluted areas, and management of the resulting waste. Reconditioning of cleaned areas and restoring them to a good condition. Implementation of a monitoring system for investigation following the elimination of pollution.
Cookies
We use Google Analytics cookies to see how the site is used. Analytics runs only with your consent.